亚博体育官网首页

亚博体育官网首页 Aircraft Hangars

亚博体育官网首页Co Buildings offers customizable pre-engineered steel aircraft hangars to suit the needs of any private aircraft owner. Picked up a Piper Cub or other vintage plane that you want to restore? A hangar will protect it, and you, from the elements. Bought a new or used turboprop or jet aircraft? The last thing you want is to leave such an expensive craft out in the open where unauthorized personnel can have access to it. Metal 鈥� in particular steel 鈥� has been the building component of choice for aircraft hangars for decades.

Why Choose 亚博体育官网首页 Aircraft Hangars?
What to Expect?
Usage
Standard Features
Resources
Icon

Clear Span & High Ceilings

Our red-iron aircraft hangars are engineered with a clear span design that provides an open, unobstructed interior. This layout delivers ample space for aircraft storage and maintenance, ensuring high ceiling clearances for all types of aircraft.
Icon

Uninterrupted Space

With no interior columns to limit movement, your steel aircraft hangar offers flexible layouts for diverse aviation needs鈥攆rom private jets to commercial fleets鈥攎aximizing every square foot.
Icon

Accelerated Construction

Pre-engineered components allow our steel hangars to be erected significantly faster than traditional builds. This streamlined process reduces downtime and gets your facility operational sooner.
Icon

Quick ROI

By completing your hangar project in a fraction of the time, you begin operations earlier鈥�providing a faster return on investment and reducing overall project costs.
Icon

Customizable Features

Our aircraft hangars offer a high degree of customization. Choose options like specialized hangar doors, integrated offices, insulation, and optimized floor plans that suit your aviation operations.
Icon

Tailored to Your Needs

Whether you require additional storage, maintenance bays, or custom lighting configurations, our flexible designs ensure that your metal aircraft hangar meets your unique operational requirements.
Icon

Low Maintenance Advantage

Constructed from durable, non-combustible steel, our aircraft hangars demand minimal upkeep. Their robust construction contributes to lower repair needs over time and enhanced overall longevity.
Icon

Cost Savings

With reduced maintenance requirements and enhanced durability, these hangars often result in lower insurance premiums and operational costs鈥攕aving money over the building鈥檚 lifespan.
Icon

Modular Expansion Capability

Our hangars are built with a modular system, making future expansion a breeze. Plan ahead for additional bays or larger openings as your aircraft inventory or operational needs grow.
Icon

Future-Ready Structure

The adaptable nature of steel aircraft hangars means you can expand your facility in phases without significant disruption鈥攑roviding long-term flexibility for your aviation business.
Icon

Modern, Professional Design

Our steel hangars combine functional design with a sleek, contemporary aesthetic. Choose from a range of finishes and colors to create a facility that reflects both efficiency and professionalism.
Icon

Built to Impress

An attractive metal aircraft hangar not only enhances curb appeal but also supports marketing and branding efforts鈥攑rojecting a high-quality image that aligns with your aviation operations.
01 Discovery & Quote (Week 1)

Begin with an initial project consultation to identify key needs and set clear goals. Our team will develop conceptual designs, prepare preliminary sketches, and provide you with a detailed quote so you know what to expect right from the start.

02 Design Sign-Off (Week 2)

After reviewing the initial designs, you鈥檒l approve the final layout and contract. We鈥檒l then coordinate the fabrication timeline and provide an estimated materials delivery date, ensuring everyone is aligned before proceeding to the next stage.

03 Engineering & Detailing (Weeks 3鈥�5, 3鈥�8, or 3鈥�12)

Our engineers produce stamped permit drawings based on your project鈥檚 complexity:

  • Small Projects (Weeks 3鈥�5): Approximately 2鈥�3 weeks for stamped drawings.
  • Medium Projects (Weeks 3鈥�8): Expect 4鈥�6 weeks for simple self-storage buildings.
  • Large/Complex Projects (Weeks 3鈥�12): More intricate designs (crane loads, mezzanines, complex rooflines, climate-controlled units) may take 8鈥�10 weeks.
04 Initial Project Requirements & Site Preparation (Typically 4鈥�8 Weeks)

With approved drawings in hand, your contractor handles permits, sitework, and foundation preparation. This pre-construction phase鈥攕ecuring necessary permits, performing site grading, and forming/pouring the foundation鈥攗sually spans 4鈥�8 weeks, setting the stage for a smooth installation.

05 Delivery Preparation

We finalize production schedules and prepare your materials for shipment. Throughout this phase, we maintain open communication, ensuring that you, your contractor, and our team are coordinated for an efficient delivery and installation process.

06 Final Project Installation (Typically 1鈥�3 Months)

Once materials are delivered, your contractor begins the metal building system (MBS) installation. Depending on complexity and site conditions, this can take 1鈥�3 months, during which we remain focused on providing a quality, durable structure that meets your expectations.

07 Walkthrough & Completion

After installation, you鈥檒l join your installer in a thorough walkthrough to ensure everything meets your specifications. Your satisfaction is our priority, and we鈥檒l continue to offer support should you need any future assistance or modifications.

亚博体育官网首页 Aircraft Hangars

亚博体育官网首页 airplane hangar

Material Choice

When it comes to choosing a metal aircraft hangar, you have two choices 鈥� steel or aluminum. Aluminum weighs less than steel 鈥� but that means it is more easily damaged.

 

亚博体育官网首页 is less expensive than aluminum. 亚博体育官网首页 does rust, which aluminum doesn鈥檛, but that鈥檚 why 亚博体育官网首页Co uses galvanized steel with a protective coating of paint.

 

亚博体育官网首页Co offers customized hangar sizes and hangar designs. Hangars can be 鈥渇ree standing鈥� 鈥� they鈥檒l consist of four walls, a door system and a roof.

 

Hangars can be any width (we鈥檒l give you a customized quote for anything over 200 feet wide) and any length. Hangars can be used for storing or working on aircraft, helicopters or for any type of aviation equipment.

 

 

 

亚博体育官网首页 airplane hangar

Customized Hangar Designs

Door system

We also offer all the door systems possible for hangars, from bi-fold doors (which raise upward) to bottom rolling doors (which slide open to either side) to allow easy ingress and egress of planes; to walk through doors along the side to allow for easy ingress and egress of people.

 

Windows

Windows and skylights let in available light and can help improve the usability of the hangar.

 

Living/office quarters

If you鈥檇 like a hangar designed with an upstairs living quarters, or office, we can do that. Simply contact us and let us know your needs.

 

Sturdiness

The whole point of a hangar is to protect your aircraft from the elements. Our hangars are designed to withstand windstorms as well as heavy ice or snow on the roof.

Your local area will have its own building codes. Our pre-engineered aircraft hangars meet or exceed all business codes. We have the experience and we know what鈥檚 needed.

 

Insulation

Depending on your location, you may or may not want your steel aircraft hangar to be insulated. If you wish your hangar to be insulation-ready, we can comply.

 

Depending on the complexity of your hangar design, it can range anywhere from 8 to 12 weeks to prefab every piece of equipment to our exacting specifications 鈥� and yours. Once everything is ready, it鈥檚 drop-shipped right to you. We will dropship your pre-engineered aircraft hangar(s) anywhere in the continental United States.

 

 

 

aircraft hangar tile photo

Contractor Locator Help

At 亚博体育官网首页Co, we not only manufacture our pre-engineered steel airplane hangars but also erect them, if our clients are in the Southeast. Outside that geographic region, we will be happy to assist you in finding a qualified contractor to erect the hangar (or hangars) for you. We have a database of qualified erectors and contractors.

 

Having said that, our pre-engineered steel aircraft hangars are manufactured in such a way that even skilled amateurs can put them together. However, since an aircraft hangar must meet a variety of codes it鈥檚 typically best for a professional contractor to do the job.

 

Stamped Building and Foundation Plans聽
100% 亚博体育官网首页, Primary & Secondary Framing
Roof & Wall Sheeting
Complete Trim & Closure
Fasteners
Delivery to Site
Erector鈥檚 network nationwide聽
Construction available in GA/TN

Please Check Back Soon

The SCB Difference

For over 24 years, 亚博体育官网首页Co Buildings has delivered top-quality pre-engineered metal building (PEMB) materials and self-storage solutions. From prefab kits to custom designs, we provide 100% American-manufactured, sustainable materials backed by stamped foundation plans and expert guidance on permits and zoning. With decades of experience and a 92% satisfaction rate, 亚博体育官网首页Co combines superior quality with unmatched customer support to ensure every project鈥檚 success.

24+ Years Expertise

Designing and Building Prefabricated Metal Buildings

Full Service

Installation & Coordination can be provided across most of the USA.

92% Satisfaction Rate

4.6 stars on Google Reviews and BBB accredited business.

Stamped Foundation Plans

These can be provided upon request.

90-100% Recyclable

Recyclability rate for the primary materials used in PEMB buildings.

100% American Manufactured

We only work with American suppliers for materials.

What our clients have to say

See why 92% of our customers rate us highly on Google Reviews.
Hear directly from clients who trust 亚博体育官网首页Co Buildings for quality, reliability, and exceptional service.

Industry Stats

Our growth measured in units, SF, and states served

3000 +

Years In Business

3000 +

Units Sold

50

States Sold In

1000000 +

Avg Annual SQFT

Frequently Asked Questions

Get answers to common questions about our self-storage building kits, customization options, and services.

01

What sizes are commonly ordered for steel airplane hangars?

亚博体育官网首页 airplane hangars can range from 10,000 square feet for small private planes to over 50,000 square feet for larger commercial aircraft. We can customize your hangar to accommodate specific aircraft sizes, storage needs, and additional features like office space or maintenance areas.

02

What door options are available for steel airplane hangars?

Common door options include hydraulic doors, bifold doors, and sliding doors. The choice depends on your operational needs, budget, and building size. Hydraulic and bifold doors are popular for their wide, unobstructed openings and ease of operation, while sliding doors offer cost-effective solutions for smaller hangars.

03

What makes steel a preferred choice for airplane hangars?

亚博体育官网首页 hangars are highly durable, weather-resistant, and offer clear-span interiors鈥攊deal for maximizing usable space and accommodating aircraft of various sizes. They are also faster to construct, more cost-effective, and easier to expand than traditional building methods, making them a practical choice for both private and commercial aviation needs.

Have A Project In Mind?

Connect with our team to explore built-to-fit construction solutions.

Ft.
Ft.
Ft.
Please enter 0 if you are unsure. Do NOT include units.

Our Service Areas

Explore our reach鈥攕erving clients nationwide with expertise across all three divisions

Where We Ship

Building Materials Nationwide

Where We Erect

Southeast USA

Construction Services

GA, SC and TN