亚博体育官网首页

亚博体育官网首页 Warehouses

Companies turn to steel warehouses because they deliver massive clear鈥憇pan interiors, ultra鈥慺ast erection and low lifetime costs. Factory鈥慶ut frames bolt together in weeks, creating column鈥慺ree space that streamlines dock鈥憈o鈥憆ack flow and adapts easily to cranes, high鈥慴ay racking or automation. Energy鈥憇aving roof coatings, insulated panels and steel鈥檚 innate fire鈥� and pest鈥憆esistance keep operating, insurance and maintenance costs down, while the structure鈥檚 modular design future鈥憄roofs the investment. Simply put, no other building system matches a steel warehouse for speed, strength, and long鈥憈erm value.

Why Choose 亚博体育官网首页 Warehouses?
What to Expect?
Standard Features
Usage
Resources
Icon

Clear Span Construction

Our warehouses feature a pre鈥恊ngineered design that eliminates interior columns. This clear span configuration delivers expansive, uninterrupted space鈥攊deal for storage logistics and forklift operations. With layouts that can reach up to 350' wide and 100' high, your facility maximizes every square foot.
Icon

Did You Know?

The modular design of metal warehouses means every component鈥攆rom beams to panels鈥攊s engineered for long spans.

This adaptability provides the flexibility needed for varied storage setups and efficient workflow design.
Icon

Customizable & Expandable

Every business is unique. Our metal warehouses are fully customizable with bespoke floor plans, varied clearance heights, and flexible layouts鈥攄esigned to fit your current operations and accommodate future growth seamlessly.
Icon

Did You Know?

The modular nature of PEMB construction enables steel warehouses to expand in phases. As your needs evolve, additional bays or sections can be integrated without disrupting your ongoing operations.
Icon

Inexpensive Yet Sturdy

Constructed from recycled steel, our red-iron warehouses deliver exceptional durability without breaking the bank. The low material waste and efficient prefabrication process make PEMB construction highly cost-effective while maintaining superior strength.
Icon

Did You Know?

PEMB warehouses offer significant savings over time due to reduced maintenance needs and fewer repairs. Their robust construction ensures the building withstands heavy loads and challenging climates, protecting your investment.
Icon

Quick & Easy Erection

Pre-engineered components allow our red-iron warehouses to be assembled up to 30鈥�50% faster than traditional construction. With materials delivered pre-cut and ready to install, project downtime and labor costs are significantly reduced.
Icon

How Fast?

亚博体育官网首页 warehouses can be operational in weeks rather than months. This accelerated timeline means faster move-ins and an earlier start toward generating revenue.
Icon

Low Maintenance & Insurance Savings

Our warehouses are built with non-combustible, durable materials that require minimal upkeep. Their resistance to pests, fire, and extreme weather translates to lower long-term operating costs.
Icon

Did You Know?

Insurance premiums for metal warehouses are often up to 30% lower compared to traditional wood-framed structures, thanks to their enhanced safety features and reduced risk of damage.
Icon

Attractive & Long Lasting

Modern PEMB warehouses boast a sleek, contemporary design that can be finished in a variety of colors and facades. They not only meet operational needs but also present a professional, attractive appearance in any industrial park.
Icon

Built for the Long Haul

亚博体育官网首页 warehouses are engineered for longevity with high-quality PBR panels that offer non-fade, long-lasting finishes鈥攐ften backed by warranties of over 20 years. This ensures a reliable, stylish structure for decades of use.
01 Discovery & Quote (Week 1)

Begin with an initial project consultation to identify key needs and set clear goals. Our team will develop conceptual designs, prepare preliminary sketches, and provide you with a detailed quote so you know what to expect right from the start.

02 Design Sign-Off (Week 2)

After reviewing the initial designs, you鈥檒l approve the final layout and contract. We鈥檒l then coordinate the fabrication timeline and provide an estimated materials delivery date, ensuring everyone is aligned before proceeding to the next stage.

03 Engineering & Detailing (Weeks 3鈥�5, 3鈥�8, or 3鈥�12)

Our engineers produce stamped permit drawings based on your project鈥檚 complexity:

  • Small Projects (Weeks 3鈥�5): Approximately 2鈥�3 weeks for stamped drawings.
  • Medium Projects (Weeks 3鈥�8): Expect 4鈥�6 weeks for simple self-storage buildings.
  • Large/Complex Projects (Weeks 3鈥�12): More intricate designs (crane loads, mezzanines, complex rooflines, climate-controlled units) may take 8鈥�10 weeks.
04 Initial Project Requirements & Site Preparation (Typically 4鈥�8 Weeks)

With approved drawings in hand, your contractor handles permits, sitework, and foundation preparation. This pre-construction phase鈥攕ecuring necessary permits, performing site grading, and forming/pouring the foundation鈥攗sually spans 4鈥�8 weeks, setting the stage for a smooth installation.

05 Delivery Preparation

We finalize production schedules and prepare your materials for shipment. Throughout this phase, we maintain open communication, ensuring that you, your contractor, and our team are coordinated for an efficient delivery and installation process.

06 Final Project Installation (Typically 1鈥�3 Months)

Once materials are delivered, your contractor begins the metal building system (MBS) installation. Depending on complexity and site conditions, this can take 1鈥�3 months, during which we remain focused on providing a quality, durable structure that meets your expectations.

07 Walkthrough & Completion

After installation, you鈥檒l join your installer in a thorough walkthrough to ensure everything meets your specifications. Your satisfaction is our priority, and we鈥檒l continue to offer support should you need any future assistance or modifications.

Stamped Building and Foundation Plans聽
100% 亚博体育官网首页, Primary & Secondary Framing
Roof & Wall Sheeting
Complete Trim & Closure
Fasteners
Delivery to Site
Erector鈥檚 network nationwide聽
Construction available in GA/TN

Nibco-Plant-Expansion-Warehouse

How Businesses Are Putting 亚博体育官网首页 Warehouses to Work Right Now

1聽听触听聽Industrial & 3PL expansion
North鈥慉merican warehousing . Third鈥憄arty logistics (3PL) firms and advanced manufacturers choose clear鈥憇pan steel warehouses for fast erection, high鈥慴ay racking, crane rails and unobstructed forklift aisles that shave hours off every shift.

2聽听触听聽E鈥慶ommerce & omni鈥慶hannel fulfillment
Online sellers live and die by speed鈥憈o鈥憁arket. A pre鈥慹ngineered warehouse ships as a precision鈥慶ut kit, so the shell goes up in weeks鈥攏ot months鈥攌eeping inventory moving. Built鈥慽n dock鈥憀ines, 32鈥� to 40鈥慺t clear heights, and optional insulated metal panels (IMPs) create an energy鈥慹fficient, future鈥憄roof hub for next鈥慸ay delivery.

3聽听触听聽Small鈥� and mid鈥憇ize producers
Metal shops, modular鈥慼ome plants and food processors like the way prefab warehouses scale: start with a 60聽脳聽120聽ft shop today; bolt on 20鈥慺t bays tomorrow without shutting down. Standard 26鈥慻a PBR walls shrug off oils, steam and fertilizer dust, while galvanized secondary framing adds extra corrosion defense.

4聽听触听聽Cold鈥慶hain & specialty storage
亚博体育官网首页 frames handle the heavy point鈥憀oads of multi鈥憈ier freezer racking and automated pallet shuttles. Because the structure sits outside the insulated envelope, thermal bridging is minimized鈥攊deal for pharmaceuticals, produce or any tight鈥憈emperature spec. Need rooftop solar? The frame is already engineered for the load.

5聽听触听聽Investor鈥憃wned 鈥渟pec鈥� space
Market analysts peg the U.S. prefab鈥慴uilding segment at 聽Developers meet that demand with 32鈥� to 36鈥慺t鈥慶lear steel warehouses on 60聽脳聽60聽ft column grids鈥攅asy to up鈥慺it with mezzanines, conveyors or mini鈥憀oad AS/RS pods when a 3PL or e鈥憈ailer signs the lease.

Please Check Back Soon

The SCB Difference

For over 24 years, 亚博体育官网首页Co Buildings has delivered top-quality pre-engineered metal building (PEMB) materials and self-storage solutions. From prefab kits to custom designs, we provide 100% American-manufactured, sustainable materials backed by stamped foundation plans and expert guidance on permits and zoning. With decades of experience and a 92% satisfaction rate, 亚博体育官网首页Co combines superior quality with unmatched customer support to ensure every project鈥檚 success.

24+ Years Expertise

Designing and Building Prefabricated Metal Buildings

Full Service

Installation & Coordination can be provided across most of the USA.

92% Satisfaction Rate

4.6 stars on Google Reviews and BBB accredited business.

Stamped Foundation Plans

These can be provided upon request.

90-100% Recyclable

Recyclability rate for the primary materials used in PEMB buildings.

100% American Manufactured

We only work with American suppliers for materials.

What our clients have to say

See why 92% of our customers rate us highly on Google Reviews.
Hear directly from clients who trust 亚博体育官网首页Co Buildings for quality, reliability, and exceptional service.

Industry Stats

Our growth measured in units, SF, and states served

3000 +

Years In Business

3000 +

Units Sold

50

States Sold In

1000000 +

Avg Annual SQFT

Frequently Asked Questions

Get answers to common questions about our self-storage building kits, customization options, and services.

01

What are the most commonly ordered sizes for steel warehouses?

亚博体育官网首页 warehouses typically range in size from 6,000 square feet to over 100,000 square feet. However, we can customize your building to meet your specific storage, manufacturing, or distribution needs.

02

Can I build my warehouse in phases?

Yes, building your warehouse in phases is entirely possible and often a smart approach for businesses anticipating growth. By understanding your long-term vision upfront, we can help you plan and blueprint for future expansions, ensuring your building’s design can accommodate additional space or features when needed. This phased approach provides flexibility while optimizing costs and timelines.

03

Why choose a steel warehouse over tilt-wall construction?

While tilt-wall buildings offer a longer lifespan of up to 100 years, steel warehouses are more cost-effective with a typical lifespan of 50 years. They are faster to construct, easier to expand, and provide a quicker return on investment. With efficient prefabrication, modular design, and lower upfront costs, steel buildings offer flexibility for phased growth and modifications鈥攎aking them ideal for businesses anticipating future expansion.

04

What are typical project timelines for steel warehouse buildings?

Timelines vary by size and complexity, but most small warehouses (around 6,000鈥�10,000 SF) can be completed in a few weeks after delivery. Medium projects (around 20,000鈥�50,000 SF) typically take 2鈥�3 months, while large-scale facilities (over 50,000 SF) may require 3鈥�6 months or more depending on permitting, site prep, and interior build-out. Our team can provide a more specific estimate based on your project scope. Please see our General FAQs page for more info on typical project timelines.

Have A Project In Mind?

Connect with our team to explore built-to-fit construction solutions.

Ft.
Ft.
Ft.
Please enter 0 if you are unsure. Do NOT include units.

Our Service Areas

Explore our reach鈥攕erving clients nationwide with expertise across all three divisions

Where We Ship

Building Materials Nationwide

Where We Erect

Southeast USA

Construction Services

GA, SC and TN